The CIA World Factbook Every edition, 1990 to 2025 Europe
Railways Albania, in 36 editions.
The entry for Albania published Railways in 36 editions of 36, from 1990 to 2025. The text changed in 26 editions. Each is shown as published. Railways in every entry.
- editions changed the text
- 26
- the first edition with it
- 1990
- the latest edition with it
- 2025
Published as “Railroads” (1990 to 1995) and “Railways” (1996 to 2025).
field in that editiontext changed from the edition beforenot in that editionthe edition shownChoose an edition on the strip beside the text, or step through them with the arrows. Mark changes compares it with the edition before: the marks are ours, words added and words removed.
2025 edition
Same as 2024Published as “Railroads”
- 543 km total;
- 509 1.435-meter standard gauge, single track and 34 km narrow gauge, single track (1988);
- line connecting Titograd (Yugoslavia) and Shkoder (Albania) completed August 1986
543 km total; 509 1.435-meter standard gauge, single track and 34 km narrow gauge, single track (1988); line connecting Titograd (Yugoslavia) and Shkoder (Albania) completed August 1986
Published as “Railroads”
- 543 km total;
- 509 1.435-meter standard gauge, single track and 34 km narrow gauge, single track (1990);
- line connecting Titograd (Yugoslavia) and Shkoder (Albania) completed August 1986
543 km total; 509 1.435-meter standard gauge, single track and 34 km narrow gauge, single track (1988); (1990); line connecting Titograd (Yugoslavia) and Shkoder (Albania) completed August 1986
Published as “Railroads”
- 543 km total;
- 509 1.435-meter standard gauge, single track and 34 km narrow gauge, single track (1990);
- line connecting Titograd (Serbia and Montenegro) and Shkoder (Albania) completed August 1986
543 km total; 509 1.435-meter standard gauge, single track and 34 km narrow
gauge, single track (1990); line connecting Titograd (Yugoslavia) (Serbia and Montenegro)
and Shkoder (Albania) completed August 1986
Published as “Railroads”
- 543 km total;
- 509 km 1.435-meter standard gauge, single track and 34 km narrow gauge, single track (1990);
- line connecting Titograd (Serbia and Montenegro) and Shkoder (Albania) completed August 1986
543 km total; 509 km 1.435-meter standard gauge, single track and 34 km narrow
narrow gauge, single track (1990); line connecting Titograd (Serbia and Montenegro)
Montenegro) and Shkoder (Albania) completed August 1986
Published as “Railroads”
- 543 km total;
- 509 km 1.435-meter standard gauge, single track and 34 km narrow gauge, single track (1990);
- line connecting Titograd (Serbia and Montenegro) and Shkoder (Albania) completed August 1986
543 km total; 509 km 1.435-meter standard gauge, single track and 34 km
km narrow gauge, single track (1990); line connecting Titograd (Serbia and
and Montenegro) and Shkoder (Albania) completed August 1986
Published as “Railroads”
- total:
- 543 km line connecting Podgorica (Serbia and Montenegro) and Shkoder completed August 1986
- standard gauge:
- 509 km 1.435-m gauge
- narrow gauge:
- 34 km 0.950-m gauge (1990)
total: 543 km total; 509 km 1.435-meter standard gauge, single track and 34 line connecting
km narrow gauge, single track (1990);Titograd Podgorica (Serbiaand Montenegro) and
Shkoder (Albania) completed August 1986
standard gauge: 509 km 1.435-m gauge
narrow gauge: 34 km 0.950-m gauge (1990)
- total:
- 670 km
- standard gauge:
- 670 km 1.435-m gauge (1995)
Rewritten: too little of the 1995 text remains to mark the changes.
total: 670 km
standard gauge: 670 km 1.435-m gauge (1995)
- total :
- 670 km
- standard gauge:
- 670 km 1.435-m gauge (1995)
total: total : 670 km
standard gauge: 670 km 1.435-m gauge (1995)
- total:
- 670 km
- standard gauge:
- 670 km 1.435-m gauge (1995)
total : total: 670 km
standard gauge: 670 km 1.435-m gauge (1995)
- total:
- 447 km (none electrified)
- standard gauge:
- 447 km 1.435-m gauge (1995)
total: 670 447 km (none electrified)
standard gauge: 670 447 km 1.435-m gauge (1995)
- total:
- 670 km
- standard gauge:
- 670 km 1.435-m gauge (1996)
total: 447 670 km (none electrified)
standard gauge: 447 670 km 1.435-m gauge (1995) (1996)
- total:
- 447 km standard gauge: 447 km 1.435-m gauge (2001)
total: 670 447 kmstandard gauge: 670 447 km 1.435-m gauge (1996) (2001)
- total:
- 447 km
- standard gauge:
- 447 km 1.435-m gauge (2001 est.)
total: 447 km
standard gauge: 447 km 1.435-m gauge (2001) (2001 est.)
- total:
- 447 km
- standard gauge:
- 447 km 1.435-m gauge (2002)
total: 447 km
standard gauge: 447 km 1.435-m gauge (2001 est.) (2002)
- total:
- 447 km
- standard gauge:
- 447 km 1.435-m gauge (2003)
total: 447 km
standard gauge: 447 km 1.435-m gauge (2002) (2003)
- total:
- 447 km
- standard gauge:
- 447 km 1.435-m gauge (2004)
total: 447 km
standard gauge: 447 km 1.435-m gauge (2003) (2004)
- total:
- 447 km
- standard gauge:
- 447 km 1.435-m gauge (2005)
total: 447 km
standard gauge: 447 km 1.435-m gauge (2004) (2005)
The same text in 2007 and 2008.
- total:
- 447 km
- standard gauge:
- 447 km 1.435-m gauge (2006)
total: 447 km
standard gauge: 447 km 1.435-m gauge (2005) (2006)
The same text in 2009 and 2010.
- total:
- 896 km
- country comparison to the world:
- 96
- standard gauge:
- 896 km 1.435-m gauge (2008)
total: 447
896 km
country comparison to the world:
96
standard gauge: 447
896 km 1.435-m gauge (2006) (2008)
- total:
- 339 km
- country comparison to the world:
- 117
- standard gauge:
- 339 km 1.435-m gauge (2010)
total:896 339 km
country comparison to the world:96 117
standard gauge:896 339 km 1.435-m gauge (2008) (2010)
The same text in 3 editions, 2012 to 2014.
- total:
- 339 km
- country comparison to the world:
- 117
- standard gauge:
- 339 km 1.435-m gauge (2009)
total:
339 km
country comparison to the world:
117
standard gauge:
339 km 1.435-m gauge (2010) (2009)
- total:
- 677 km
- standard gauge:
- 677 km 1.435-m gauge (2014)
- country comparison to the world:
- 118
total: 677 km339 standard gauge: 677 km 1.435-m gauge (2014)
country comparison to the world: 118
117
standard gauge:
339 km 1.435-m gauge (2009)
- total:
- 677 km
- standard gauge:
- 677 km 1.435-m gauge (2014)
- country comparison to the world:
- 104
total: 677 km
standard gauge: 677 km 1.435-m gauge (2014)
country comparison to the world: 118 104
- total:
- 677 km (447 km of major railway lines and 230 km of secondary lines)
- standard gauge:
- 677 km 1.435-m gauge (2015)
- country comparison to the world:
- 104
total: 677 km (447 km of major railway lines and 230 km of secondary lines)
standard gauge: 677 km 1.435-m gauge (2014) (2015)
country comparison to the world: 104
The same text in 4 editions, 2018 to 2021.
- total:
- 677 km (447 km of major railway lines and 230 km of secondary lines) (2015)
- standard gauge:
- 677 km 1.435-m gauge (2015)
total: 677 km (447 km of major railway lines and 230 km of secondary lines) (2015)
standard gauge: 677 km 1.435-m gauge (2015)
country comparison to the world: 104
- total:
- 677 km (2015) (447 km of major railway lines and 230 km of secondary lines)
- standard gauge:
- 677 km (2015) 1.435-m gauge
total: 677 km (2015) (447 km of major railway lines and 230 km of secondary lines) (2015)
standard gauge: 677 km (2015) 1.435-m gauge (2015)
The same text in 3 editions, 2023 to 2025.
- total:
424 km (2017)
2021-All the trains in the country suspended
total: 677 km (2015) (447 km of major railway lines and 230 424 km of secondary lines) (2017)standard gauge: 677 km (2015) 1.435-m gauge 2021-All the trains in the country suspended
No edition has those words. Try a shorter word.
Cite this page
Central Intelligence Agency. “Albania: Railways.” The World Factbook, 1990–2025 editions. Archived by The Factbook, thefactbook.org/albania/railways.